Vancouver Campus Infrastructure Analysis

For this project, MENG Analysis provided cost estimating at the schematic, design development, and construction document phases. We then provided a Life Cycle Cost Analysis and focused on the selection of proper equipment to assist in long range campus planning.

 
©2009 Meng Analysis